Audit Date
Audit Ref
1. Site Profile, Access & Logistics
Engineer Name
Engineer ID
Site Name
Site Code / Ref
Full Site Address
Building Type / Floors
Primary Site Contact
Primary Contact Tel
Out-of-Hours / Security
Parking & Loading Bay
Access, Key Safe & Alarm
Permits (PTW), Restrictions & Lone-Working / Signal Notes
2. Mains Isolation Points & Utility Meters
Electricity Main Intake & IsolationELECTRICITY
Switchroom / Main Isolator / ACB Location
MPAN / Meter Serial
Sub-DBs / Generator / UPS / ATS Notes
Access / Key Needed
Gas Main ECV & InterlocksGAS
Main ECV & Meter Location
MPRN / Meter Serial
Solenoid / Knock-Off Buttons / Interlocks
Access / Key Needed
Water Main Stopcock, CWST & BoostersWATER
Main External / Internal Stopcock Location
Water Meter Serial
CWST / Booster Set / Calorifier Isolation
Access / Key Needed
Fire Systems / Sprinkler / District Heating (Optional)FIRE / OTHER
Fire Panel, Sprinkler Stop Valve / Riser Inlet
Access / Key / Notes
3. Critical Plant & Compliance Locations
4. Statutory Compliance & Site Documentation Check
5. Pre-Existing Issues & Dilapidations Log
6. General Site & Access Photos
Tap to add general site photos (frontage, parking, plant rooms, signage)
7. Handover & Sign-Off
Site Condition Acknowledgement: The parties below confirm that the isolation points, site documentation status, and pre-existing defects recorded in this audit reflect the condition of the site on initial attendance.
Engineer Signature
Sign with finger or stylus
Client / Site Contact Signature
Sign with finger or stylus